下料弯头 |
|
|
公称通径(Ф) |
法兰孔中心(Dmm) |
法兰外径(Dmm) |
螺孔数量直径(Dmm) |
下料出口直径(Dmm) |
法兰中心(Dmm) |
法兰孔外径(Dmm) |
螺孔数量 |
其他进出口尺寸 |
A |
B |
C |
D |
E |
80 |
200 |
235 |
8-18 |
300 |
445 |
485 |
12-23 |
320 |
530 |
420 |
477 |
225 |
100 |
225 |
260 |
8-18 |
300 |
445 |
485 |
12-23 |
320 |
530 |
420 |
477 |
225 |
150 |
280 |
315 |
8-18 |
300 |
445 |
485 |
12-23 |
375 |
530 |
420 |
425 |
250 |
200 |
335 |
370 |
12-18 |
300 |
445 |
485 |
12-23 |
375
|
530 |
420 |
552 |
250 |
|
|
(安装说明)
瓷衬耐磨瓷管,结构形式如图(1),是将工程耐磨陶瓷内衬于钢壳以内,两端法兰和其它管道相连。所以安装时请按下列要求操作:
1.严禁用锤子等金属敲击钢壳,外表及两端瓷面,以免损坏陶瓷。
2.瓷衬管和瓷衬管相连时,中间加3-5mm石棉垫,然后用螺栓均匀拧紧,如图示(1)
3.瓷衬管和钢管相连时,请先将非标法兰套于钢管上,加石棉垫片,并用螺栓固定法兰,螺孔,然后点焊,非标法兰和钢管固定。再松开螺栓,将非标法兰和钢管焊牢,如图(2) |
|
 |
|
|
The strucural form of the procelain-lined anti-wearing ceramic tipe is as Shown in fig(1).It is to put the anti-wearing ceramic inner spacer in the Case with its two ends joined to the other pipelines with a flange.
It should be installed according to the follow-ing operatins demands:
1.It is strictly not allowed to strike the steel case.the outer surface and the ceramies faces at the two ends with a hammer or other metallic articies to avoid damaging the ceramies.
2.When the two porcelain-lind pipes are going to be joined to gether,be sure to use an asbesto spacer (Attached with the product)of 3-5m to Beplaced between them.Then get ti tightened with a bolt as shown in fig.(1)
3.As the porceanin-lined pipe is Going to be joined to the steel pipe,please,first,get the nonstan-dard flance to be covered on the steel pipe with an asbestos spacer and let the flange and Screw fixed up with bolts.then.get Them to be spot-welded.Loosen the bolt as the nonstandard flange and steel pipe are both fixed up.then.get them welded tight.asshowninfIg, |
|
|
|